Mountain Buzz banner

1 - 1 of 1 Posts

·
Registered
Joined
·
86 Posts
Discussion Starter #1
State Bridge Landing suffered minor damage due to runoff that overtopped the ramp. Eagle County is planning to repair this damage and make other minor improvements to the driveway and secondary launch area.

This may require a temporary closure on Monday, June 30th and Tuesday, July 1. Our contractors will work hard to keep the ramp area open, but at the very least you should expect delays during this period. You may want to avoid State Bridge altogether, which is what I recommend.

Two Bridges River Access was not damaged, but the high flows deposited many tons of silt into the ramp area. We are working to get it cleaned up, but the site is very functional for the time being. The take out located between the two bridges has been closed.

This repair work is being funded by user fees collected by BLM and Eagle County.

Please call me with questions, happy boating!

Toby Sprunk
Eagle County Open Space Director
970-471-6776
 
1 - 1 of 1 Posts
Top