Mountain Buzz banner

1 - 2 of 2 Posts

·
Registered
Joined
·
39 Posts
Discussion Starter #1
See below for info on the bridge construction project in Edwards this spring/summer. As I'm not terribly familiar with the project, please specific questions to the number below. You can sign up for updates/info using the directions/email below. Be safe!




"ATTENTION EAGLE RIVER BOATERS AND WATER RECREATIONALISTS:
Please be aware that the Eagle River Bridge is an active construction area. Eagle River remains open to boating, but please use extra caution while navigating the area around the Eagle River Bridge.
A number of overnight closures of the river will be required to install a pedestrian bridge, and set girders for the roadway bridge. These overnight closures are anticipated to take place in early June and early September, respectively. To stay informed of the closure dates and other project details please sign up for project updates by emailing [email protected] or calling 970-446-1001. Construction will be ongoing along Edwards Spur Road through Winter 2019."
 

Attachments

·
Registered
Joined
·
39 Posts
Discussion Starter #2
Update on the Eagle River bridge in Edwards:


UPCOMING RIVER CLOSURE
Crews with the Edwards Spur Road project will be placing the new pedestrian bridge that spans the Eagle River on Wednesday, June 19th from 2:00 pm to 4:00 pm.


While the river will not be closed, for safety reasons the contractor is requesting that all river traffic avoid the location of the pedestrian bridge between 2:00 pm – 4:00 pm. Please plan accordingly to avoid this area during this time.
If you have any questions you can contact the project team at:
EMAIL: [email protected]
HOTLINE: 970-446-1001
 
1 - 2 of 2 Posts
Top