Mountain Buzz banner

1 - 5 of 5 Posts

·
Registered
Joined
·
3,344 Posts
I thought they were going to let more water out of the dam when the Yampa peaked? Soon maybe?
 

·
Registered
Joined
·
169 Posts
Dam release schedule

The green has dropped a bit because of the cooler temperatures earlier in the week but they are expected to come back up. As far as the dam is concerned they aim for a flow of 8300 measured at Jensen for 1 to 6 days once larval razorback sucker are found down stream. After that plans are to run a steady 820 cfs.

You can visit the Bureau of reclamation website and find info on dam releases. Bureau of Reclamation - Upper Colorado Region Water Operations: Current Status: Flaming Gorge Reservoir
 
1 - 5 of 5 Posts
Top