I’ve been waiting for the speculation to begin as to when the Boundary Creek road will open this year. Last I checked the Salmon drainage was at 84% of normal snow pack and Banner Summit was at 48” snow depth and 19.3” SWE.
I have a 15 May permit. Anyone like to shovel and have a permit prior to that? I’m going one way or another so let the speculation begin.
Cheers,
Trevor
I have a 15 May permit. Anyone like to shovel and have a permit prior to that? I’m going one way or another so let the speculation begin.
Cheers,
Trevor