State Bridge to Two Bridges - Mountain Buzz
 



Reply
 
Thread Tools Display Modes
 
Old 06-12-2014   #1
 
Join Date: Feb 2007
Posts: 86
State Bridge to Two Bridges

The flow has dropped to a level where passing under Two Bridges is do-able. As a result, we intend to close the alternate take-out between the bridges next week, please plan to use the regular take-out.

Speaking of which, the launch area is clogged with many tons of sediment, but is otherwise functional. We intend to have it dredged, but this will require additional permitting, planning, etc.

As always, please call me with questions,

Toby Sprunk
Open Space Director
970-471-6776
Attached Thumbnails
Click image for larger version

Name:	unnamed.jpg
Views:	234
Size:	162.5 KB
ID:	8532  

tsprunk is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Topic Thread Starter Forum Replies Last Post
Two Bridges Upper Colorado! eddyout River Access & Safety Alerts! 4 05-25-2014 07:19 PM
Two Bridges, Upper Colorado CRG River Access & Safety Alerts! 0 05-23-2014 12:11 PM
Two Bridges River Access Opens 7/21 tsprunk River Access & Safety Alerts! 5 07-31-2012 08:04 AM
Two Bridges River Access tsprunk River Access & Safety Alerts! 7 04-04-2012 04:11 PM
LOST Seven-two paddle BRIDGES LiquidGuy87 Lost & Found 0 06-03-2009 07:05 PM

» Classified Ads
Powered by vBadvanced CMPS v3.2.3

All times are GMT -6. The time now is 04:04 PM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.