Roaring Fork River Delays/27th Street Bridge Construction

The 27th Street Bridge in Glenwood Springs is closed and will remain closed through the weekend for pedestrian bridge installation and traffic bridge girders.

Critical overhead work will occur during daylight hours. Follow posted signage and be aware for flaggers at West Bank and 3 Mile Creek. You may be asked to eddy-out at 3 Mile Creek for safety while overhead work occurs.

Call (or text) before you float for the latest river status, 970-618-5379.

Public Information is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 07-27-2019   #2
 
Defiance, CO, Colorado
Paddling Since: 2000
Join Date: Jun 2008
Posts: 176
Bridge reopened and construction was done about 7pm today, Saturday July, 27th
noahfecks is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Classified Ads
Powered by vBadvanced CMPS v3.2.3

All times are GMT -6. The time now is 05:57 PM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.