Old 05-06-2017   #1
 
Denver, Colorado
Paddling Since: 2005
Join Date: Feb 2009
Posts: 108
Dolores - Intermittent River Closures at Bedrock May 8th-12th, 15th-19th

https://www.codot.gov/projects/sh-90...-c/river-users

CDOT and SEMA Construction will begin lifting the large precast members for the new Bedrock Bridge over the Dolores River at Colorado Highway (CO) 90 on Tuesday, May 9. River users will encounter intermittent half hour river closures at this location just north of the Bedrock boat ramp, while large pieces of concrete are suspended over the river and positioned into place.

MAY ACTIVITY:

Monday, May 8: The buoys will be placed in the water.
Tuesday, May 9 ― Friday, May 12: Periodic half hour river closures are anticipated.
Saturday & Sunday, May 13-14: There will be NO CLOSURES over the weekend. Please note buoys will remain in the river during the “open” condition.
Monday, May 15 ― Friday, May 19: Dependent upon construction progress, intermittent closures may have to continue into the week.

RIVER USER IMPACTS & RIVER CLOSURE PROCESS:

A flagger will be stationed at the Bedrock boat ramp to answer questions, give direction and inform boaters of the possible closure ahead.
A large pre-warning yellow buoy (affectionately named “The Minion”) is in place on the river approximately 1,000 feet before the Bedrock boat ramp warning boaters of potential half hour closures.
While waiting for the river to re-open, boaters can “park” or anchor boats, rafts, or kayaks to two white buoys (with blue stripes) using ropes attached to the buoys. These two buoys are located near the boat ramp. Or if possible, for smaller crafts, wait out the closure by catching an eddy.
Be aware of a rope line of 7 orange buoys across the river indicating a closure, if the white buoys are missed, please grasp the orange buoy rope.
Once crane operations are concluded and passage under the bridge construction is safe, the flagger will re-open the river (remove the orange buoy rope from across the river) and allow boaters to pass through the bridge construction zone safely.

markdl is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Topic Thread Starter Forum Replies Last Post
Bedrock bridge-Dolores river closure safety Fruita Boater River Access & Safety Alerts! 5 04-19-2017 12:08 PM
Lost White Paco Pad at Bedrock takeout Dolores River Caleb Lost & Found 1 06-06-2011 02:48 PM
Dolores - Bedrock to Gateway? syperk Whitewater Kayaking 8 05-14-2008 07:57 AM
Dolores Bedrock to Gateway Fuzzy Whitewater Kayaking 0 04-23-2008 04:36 PM
Dolores Slickrock to Bedrock durangoskiier Kayaking | Trip Planner 0 04-07-2008 09:48 AM

» Classified Ads
Powered by vBadvanced CMPS v3.2.3

All times are GMT -6. The time now is 04:29 PM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.