Colorado River Delays Coming Mid-July - Mountain Buzz
 



Reply
 
Thread Tools Display Modes
 
Old 06-10-2016   #1
 
Glenwood Springs, Colorado
Paddling Since: 2010
Join Date: Feb 2016
Posts: 34
Colorado River Delays Coming Mid-July

Colorado River Delays Coming Mid-July
Grizzly Creek and No-Name put-ins will be delayed until noon.

Call our hotline or email us for dates of closures:
970-618-9897 or samantha at prstudioco dot com.

We have been working with permitted commercial outfitters in the area to coordinate these delays. These delays are necessary for overhead work for the new pedestrian bridge in downtown Glenwood Springs. We will be erecting steel girders for 3 - 5 days. Stay tuned for more information.
Attached Files
File Type: pdf 16-GAB Water Saftey FlyerJune(web).pdf (153.8 KB, 31 views)

grandavenuebridge is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Tags
colorado river

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Topic Thread Starter Forum Replies Last Post
NSV - CDOT No More Weekend Travel Delays Chief Niwot Whitewater Kayaking 0 06-04-2014 10:29 AM
Hells Canyon Road Delays Sully1987 Rafting | Trip Planner 0 05-24-2014 11:20 PM
Hells Canyon Dam Delays and Construction on Highway 95 Sully1987 Rafting | Trip Planner 2 07-19-2013 05:09 PM
RRFW Riverwire - Diamond Creek Flashflood Delays River Runners Tom Martin Whitewater Kayaking 0 09-01-2007 09:56 AM

» Classified Ads
Powered by vBadvanced CMPS v3.2.3

All times are GMT -6. The time now is 10:40 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.