Windy Gap Firming Enviro work done (Colo River) - Mountain Buzz
 

Go Back   Mountain Buzz > Whitewater Boating > Whitewater Kayaking


Reply
 
Thread Tools Display Modes
 
Old 11-30-2011   #1
 
Loveland, Colorado
Join Date: Oct 2003
Posts: 510
Windy Gap Firming Enviro work done (Colo River)

All,
This morning, Reclamation announced the availability of the Final Environmental Impact Statement for the proposed Windy Gap Firming Project.

The FEIS is a large document, but can be downloaded in PDF from our website. It can be viewed in hard copy at libraries local to Grand County and across northeastern Colorado. A link to the list of libraries is also available, on-line.

Please let me know if you have any related questions.

Best,
Kara





__________________
Kara Lamb
Public Information
Eastern Colorado Office
Bureau of Reclamation
klamb is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Topic Thread Starter Forum Replies Last Post
I LEFT MY CAMERA BELOW PINBALL POINT ON THE UPPER COLO RIVER Tomaye Lost & Found 0 09-29-2011 12:32 AM
day 1: Gorge trip, ice cold, windy, and sore Ken Vanatta Whitewater Kayaking 7 02-09-2009 01:35 PM
Enviro Job in Crested Butte Meng The Eddy 0 09-04-2008 03:43 PM
Windy Gap Firming Project DRAFT EIS klamb Whitewater Kayaking 7 09-03-2008 01:41 PM
Looking for people to paddle with after work in Colo Spgs mrekid Whitewater Kayaking 1 06-17-2004 12:03 PM

Powered by vBadvanced CMPS v3.2.3

All times are GMT -6. The time now is 02:05 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.