Revised ICP Comments due March 5 - Mountain Buzz
 



Reply
 
Thread Tools Display Modes
 
Old 02-27-2004   #1
Have paddled a Quest
 
Fort Collins, Colorado
Paddling Since: 1984
Join Date: Oct 2003
Posts: 102
Revised ICP Comments due March 5

As previously posted, the Arkansas Headwater Recreation area has revised the Integrated Concept Plan which substantially changes river management of the Arkansas, Browns Canyon and The Numbers in particular. There will be no public hearings on the revised ICP, but input is being taken in e-mail or written form until March 5 at:

Arkansas Headwater Recreation Area
307 W. Sackett
Salida, CO 81201

[email protected]

My personal opinion is that this is a bad deal for kayakers. The revised ICP allows for more than double the number of commercial rafts in The Numbers by 2008 (90 boats per day in '08 versus 40 bpd last summer), while only temporarily mitigating the spectre of permitting on Browns Can yon. The Numbers is arguably the best kayak run in Colorado, and the original river management plan was wisely set up to protect that valuable resource for kayakers. While the ICP re-iterates provisions in the original river management plan for increasing the number of commercial boats in the Numbers by 10bpd each year, and stopping the increase if there are corresponding increases in user conflicts between private and commercial boaters, these provisions are vaguely outlined and will be difficult to enforce. Read the revised ICP and send in your comments:

Integrated Concept Plan

Arkansas Headwaters Recreation Area - 02/12/04

*

The below noted information consists of an Integrated Concept Plan (ICP) to provide assistance in resolving a number of Private Boat and Special Use Agreement issues that have been brought to the attentionof Colorado State Parks and the Bureau of Land Management.

*

Reduction of Commercial Boat Per Day (bpd) Carrying Capacities

*

Browns Canyon (Section 2 B) – Reduce Commercial Capacity on weekends & holidays from 450 bpd to 360 bpd.

Rationing will be implemented only on those days where bpd capacities are reached or exceeded; other days in Section 2 B will not be Rationed until those days reach or exceed bpd capacity.*Rationed Days currently allocated at 450 bpd will remain allocated at 450 bpd until Demand dictates the elimination of those Rationed Days in Section 2 B.*"Retroactive Rationing" of commercial use will not be used.*

Effective Time Period: 05/15 – 09/07

*

Parkdale (Section 4 B) - Reduce Commercial Capacity on weekends & holidays from 300 bpd to 240 bpd.* This 60 bpd reduction will be available for commercial use on Rationed Days on weekends & holidays in Section 4 B when theRoyal Gorge (Section 5) is under a High Water Advisory from AHRA.* Rationing will be implemented only on those days where bpd capacities are reached or exceeded; other days in Section*4 B will not be Rationed until those days reach or exceed bpd capacity.*Rationed Days currently allocated at 300 bpd will remain allocated at 300 bpd until Demand dictates the elimination of those Rationed Days in Section 4 B.*"Retroactive Rationing" of commercial use will not be used.*

*

The plan provides for an initial reduction in Commercial Capacity during the high-use season in Section 4 B, from 300 bpd to 240 bpd on weekends and holidays.* This section capacity, at the discretion of the AHRA managers, can potentially increase to 270 bpd and then 300 bpd, or go to 300 bpd without an incremental increase once the following condition is met:

-*********There are 21 or more Rationed Days in Section 4 B.

Effective Time Period: 05/15 - 09/07

*

Increase in Commercial Boat Per Day (bpd) Carrying Capacities

*

Numbers (Section 1 C) – Increase Commercial Capacity on all days from 60 bpd to 90 bpd.*The 30 bpd increase in Commercial Capacity will be restricted to 10 bpd increments and only allowed if the following conditions, as outlined in the Arkansas River Recreation Management Plan, can be met:

-*********Existing facilities can be expanded to accommodate the increase in commercial boating traffic/use;

-*********Additional resource degradation does not occur with the preceding incremental increase;

-*********Increases in conflicts between user groups do not occur with the preceding incremental increase.

Effective Time Period:*05/15 – 09/07

*

Adjustment of Commercial Launch Window

*

Numbers (Section 1 C) – Adjust Commercial Launch Window from8:30 am – 11:00 am to 8:30 am – 2:00 pm.

Effective Time Period: 05/15 – 09/07

*

Reduction in Private Boat Per Day (bpd) Carrying Capacities

*

Numbers (Section 1 C) – Reduce Private Capacity on all days from 350 bpd to 320 bpd.*Such reduction will only occur if and when there is a corresponding increase in Commercial Capacity.

Effective Time Period:*05/15 – 09/07

*

Increase in Private Boat Per Day (bpd) Carrying Capacities

*

Browns Canyon (Section 2 B) – Increase Private Capacity on weekends & holidays from 150 bpd to 240 bpd.*In order to reduce potential user conflicts and/or congestion at the Hecla Junction Recreation Site, AHRA staff will take the following mitigating actions:

-*********Install signage at Browns Canyon put-in locations encouraging private boaters to launch prior to or after commercial launch times.*Specifically, such signage will encourage private boaters to launch after 3:00 PM.

-*********Expand the Inflating/Deflating Beach Area for private boaters.

-*********Improve and/or expand parking facilities where possible.

-*********Station park staff at the boat ramp during peak use times to assist with congestion and traffic control.

Effective Time Period: 05/15 – 09/07

*

Private Boat Permit System

*

Work with Private Boat Permit Planning Team to establish a working framework for an AHRA Private Boat Permit System.*The Private Boat Permit System, if and when established forBrowns Canyon, will designate 40 bpd to be launched after 3:00 PM.

*

Minimum Fee

*

The purpose of the Minimum Fee is to recover those fixed costs associated with managing Special Use Agreements within the Arkansas Headwaters Recreation Area.

*

Increase Minimum Fee for Special Use Agreements/Boating from the current $400 per year to $1,500 per year.*The increase will be phased in over a three-year period.*In 2004 the increase will be from $400 to $700.*In 2005 the increase will be from $700 to $1,200.*In 2006 the increase shall be from $1,200 to $1,500.

*

Increase Minimum Fee for Special Use Agreements/Non-Boating from the current $250 per year to $500 per year.

The increase will be phased in over a three-year period.*In 2004 the increase will be from $250 to $330.*In 2005 the increase will be from $330 to $410.*In 2006 the increase will be from $410 to $500.

*

Minimum Per Client Fee

*

Establish Minimum Per Client Fee for Special Use Agreements/Boating – 5.25% of Gross with a minimum of $2.00 Per Client (Equivalent to current AHRA Individual Pass Fee).

*

Agreement Transfer Incentive

*

$5,000 Agreement Transfer Fee if Boating Agreement is Transferred.

$0 Agreement Transfer Fee if Boating Agreement is Retired (Use Transferred).

$500 Agreement Transfer Fee if Non-Boating Agreement is Transferred.

Minimum Operating Requirement

*

Establish a 3-year Minimum Operating Requirement prior to transfer of Special Use Agreement/Boating.

Agreement retired if Minimum Operating Requirement is not executed.

Marco is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Topic Thread Starter Forum Replies Last Post
comments miker Support & Feedback 2 03-03-2007 10:01 AM
Super EZ a dry boat? Comments please! michaeljones Whitewater Kayaking 4 02-02-2006 06:52 PM
Anyone have comments on this interesting rafting technique? stiff Whitewater Rafting 11 05-01-2005 12:17 PM
My comments on the ICP (Ark Plan) below... Mike Harvey Whitewater Kayaking 12 02-20-2004 12:51 AM
Revised Ratings - Humor for Jonesing Boaters Andy H. Whitewater Kayaking 0 01-10-2004 02:09 AM

» Classified Ads
Powered by vBadvanced CMPS v3.2.3

All times are GMT -6. The time now is 01:15 AM.