Good question, and the short answer is "not sure." We don't yet know if we are going to continue the spring peak release as originally intended yet or not. We have been slowly incrementing, but haven't been able to get back to our 5,000 cfs release yet. Once we do (or once we get to whatever "peak" release we can safely make), we will discuss with the SJRIP to determine what they recommend for the remainder of the spring peak release period.

I would guess I'll know more in a week or so, so give me a call or email me and I'll update you if I know anything new.

---
Susan Novak Behery, P.E.
Hydraulic Engineer
Reclamation
Western Colorado Area Office
Durango, CO
sbehery@usbr.gov
970-385-6560

sjnovak3 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 06-03-2016   #12
 
Tyrrache's Avatar
 
Lakewood, Colorado
Paddling Since: 2004
Join Date: Oct 2014
Posts: 94
Looks like the Animas has begun its run! I saw 4100CFS on the AW flow page.

So they should link up with your 4,000cfs out of Navajo. Any idea if you'll be back up to 5,000 anytime soon?
Tyrrache is offline   Reply With Quote
Old 06-03-2016   #13
 
Durango, Colorado
Paddling Since: 2000
Join Date: Jun 2004
Posts: 188
Short answer, I don't know. We are trying to get back to 5,000 cfs, but we have to inch up very slowly. We are working with the Office of Emergency management to determine when it is safe to increase. Mostly the issues are between Blanco and Farmington, where there is a ton of channel encroachment (both natural and man-made).

Susan
sjnovak3 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 06-04-2016   #14
 
Durango, Colorado
Paddling Since: 2000
Join Date: Jun 2004
Posts: 188
Folks-
Going up to 4450 cfs (or so) at 1pm today. If everything continues to look ok, we will hold this until at least Monday.

Susan


BUREAU OF RECLAMATION
NAVAJO RESERVOIR
2016 SPRING PEAK RELEASE UPDATE
June 4, 2016
SENT VIA FAX AND E-MAIL
The Bureau of Reclamation will resume increasing the release out of Navajo Reservoir today, June 4th at 1:00 PM, reaching 4,450 cubic feet per second (cfs). This release will be held to evaluate conditions along the San Juan River. If it is determined there is no significant risk to the public safety, releases will be increased in small increments with a goal of reaching 5,000 cfs. Any increases will be accompanied by future public notifications. Areas in the immediate vicinity of the river channel may be unstable and dangerous. Please use extra caution near the river channel and protect and/or remove any valuable property in these areas.

During spring operations, releases from the Navajo Unit will be made in an attempt to remain at or below the U.S. Army Corps of Engineers safe channel capacity of 5,000 cfs between Navajo Dam and the confluence with the Animas River in Farmington, and 12,000 cfs downstream of Farmington. The release may be changed or reduced if precipitation forecasts show risk of exceeding safe channel capacity in the San Juan River San Juan River.

If you have any questions, or would like further information, please contact Susan Behery at 970-385-6560 or email at sbehery@usbr.gov, Marc Miller at 970-385-6541, email at mbmiller@usbr.gov, Ryan Christianson 970-248-0652, email rchristianson@usbr.gov.
sjnovak3 is offline   Reply With Quote
Old 06-05-2016   #15
 
Durango, Colorado
Paddling Since: 2000
Join Date: Jun 2004
Posts: 188
We are going back to our release of 4,000 cfs starting this morning in coordination with the San Juan County Office of Emergency Management. I'm guessing we will hold it here for a while now.

Susan

BUREAU OF RECLAMATION
NAVAJO RESERVOIR
2016 SPRING PEAK RELEASE UPDATE
June 5, 2016
SENT VIA FAX AND E-MAIL

The Bureau of Reclamation will decrease the release out of Navajo Reservoir today, June 5th at 8:30 AM, reaching 4,000 cubic feet per second (cfs). This release will be held to evaluate conditions along the San Juan River. Any further changes will be accompanied by future public notifications. Areas in the immediate vicinity of the river channel may be unstable and dangerous. Please use extra caution near the river channel and protect and/or remove any valuable property in these areas.

During spring operations, releases from the Navajo Unit will be made in an attempt to remain at or below the U.S. Army Corps of Engineers safe channel capacity of 5,000 cfs between Navajo Dam and the confluence with the Animas River in Farmington, and 12,000 cfs downstream of Farmington. The release may be changed or reduced if precipitation forecasts show risk of exceeding safe channel capacity in the San Juan River San Juan River.

If you have any questions, or would like further information, please contact Susan Behery at 970-385-6560 or email at sbehery@usbr.gov, Marc Miller at 970-385-6541, email at mbmiller@usbr.gov, Ryan Christianson 970-248-0652, email rchristianson@usbr.gov.
sjnovak3 is offline   Reply With Quote
Old 06-08-2016   #16
 
Durango, Colorado
Paddling Since: 2000
Join Date: Jun 2004
Posts: 188
Hi folks- it's like groundhog day here, we're going to start coming up again, just even more slowly. We'll start today with a 100 cfs bump, then do another 100 cfs bump tomorrow and another Friday. Then we'll hold the release through the weekend, hopefully be able to release a bit more next week. Let me know if you have questions.

Susan

---
Susan Novak Behery, P.E.
Hydraulic Engineer
Reclamation
Western Colorado Area Office
Durango, CO
sbehery@usbr.gov
970-385-6560
---



BUREAU OF RECLAMATION
NAVAJO RESERVOIR
2016 SPRING PEAK RELEASE UPDATE
June 8, 2016

SENT VIA FAX AND E-MAIL

The Bureau of Reclamation will resume increasing the release out of Navajo Reservoir in small increments. The increase will begin today, June 8th, at 12:00 PM, and will continue very slowly through Friday, June 10th, at 8:00 AM. The total increase over these days will be 300 cfs, bringing the total release from 4,000 cfs to 4,300 cfs. This release will be held through the weekend to evaluate conditions along the San Juan River. Any further release changes will be accompanied by future public notifications. Areas in the immediate vicinity of the river channel may be unstable and dangerous. Please use extra caution near the river channel and protect and/or remove any valuable property in these areas.

During spring operations, releases from the Navajo Unit will be made in an attempt to remain at or below the U.S. Army Corps of Engineers safe channel capacity of 5,000 cfs between Navajo Dam and the confluence with the Animas River in Farmington, and 12,000 cfs downstream of Farmington. The release may be changed or reduced if precipitation forecasts show risk of exceeding safe channel capacity in the San Juan River San Juan River.

If you have any questions, or would like further information, please contact Susan Behery at 970-385-6560 or email at sbehery@usbr.gov, Marc Miller at 970-385-6541, email at mbmiller@usbr.gov, Ryan Christianson 970-248-0652, email rchristianson@usbr.gov.
sjnovak3 is offline   Reply With Quote
Old 06-20-2016   #17
 
Durango, Colorado
Paddling Since: 2000
Join Date: Jun 2004
Posts: 188
I've been getting a lot of questions regarding ramp-down--

Things have changed A LOT since we started the release, and have changed in ways I didn't think they would. Right now we ARE, in fact, extending the release slightly, since we were unable to reach 5000 cfs. So the new plan, as long as the USGS Shiprock gage (or Four Corners gage, since Shiprock is out right now) is >5000 cfs, we will continue releasing at our current rate. So that's what you can keep an eye on.

Ramp down will begin when those downstream gages fall to 5000 cfs. The forecast on when this happens is kind of bumpy right now- anywhere from the 25th to the 30th of June is in the running. But when start the ramp it will be a long and luxurious 12 days down.

Call or email if you want updates-

Susan
---
Susan Novak Behery, P.E.
Hydraulic Engineer
Reclamation
Western Colorado Area Office
Durango, CO
sbehery@usbr.gov
970-385-6560
sjnovak3 is offline   Reply With Quote
Old 06-30-2016   #18
 
Durango, Colorado
Paddling Since: 2000
Join Date: Jun 2004
Posts: 188
Ramp down starts tomorrow (July 1).

OF RECLAMATION
NAVAJO RESERVOIR
2016 SPRING PEAK RELEASE UPDATE
June 30, 2016



SENT VIA FAX AND E-MAIL



Reclamation will begin ramping down the release from Navajo Reservoir beginning tomorrow, Friday, July 1st. Ramp down will be 12-days long, ending at a release of 500 cfs on July 12th. Following ramp down, releases will be made to maintain the recommended target base flow in the critical habitat reach. While flows are still high, areas in the immediate vicinity of the river channel may be unstable and dangerous. Please use extra caution near the river channel and protect and/or remove any valuable property in these areas.



During spring operations, releases from the Navajo Unit will be made in an attempt to remain at or below the U.S. Army Corps of Engineers safe channel capacity of 5,000 cfs between Navajo Dam and the confluence with the Animas River in Farmington, and 12,000 cfs downstream of Farmington. The release may be changed or reduced if precipitation forecasts show risk of exceeding safe channel capacity in the San Juan River San Juan River.



If you have any questions, or would like further information, please contact Susan Behery at 970-385-6560 or email at sbehery@usbr.gov.
sjnovak3 is offline   Reply With Quote
Old 06-30-2016   #19
 
north little rock, Arkansas
Join Date: Sep 2010
Posts: 371
Dang! I knew it wouldn't last for our trip.
lncoop is offline   Reply With Quote
Old 07-11-2016   #20
 
Durango, Colorado
Paddling Since: 2000
Join Date: Jun 2004
Posts: 188
BUREAU OF RECLAMATION
NAVAJO RESERVOIR RELEASES

SENT VIA FAX AND E-MAIL
July 11, 2016


Reclamation has finished ramping down from the 2016 Navajo Reservoir Spring Peak Release. As a result of hot dry weather, decreasing tributary inflows, and increasing irrigation demand in the San Juan River Basin, the Bureau of Reclamation will remain at the current release of 800 cfs until further notice. Releases are made for the authorized purposes of the Navajo Unit, and to attempt to maintain a target base flow through the endangered fish critical habitat reach of the San Juan River (Farmington to Lake Powell).

The San Juan River Basin Recovery Implementation Program recommends a target base flow of between 500 cfs and 1,000 cfs through the critical habitat area. The target base flow is calculated as the weekly average of gaged flows throughout the critical habitat area.

This scheduled release change is subject to changes in river flows and weather conditions. If you have any questions, please contact Susan Behery at 970-385-6560 or sbehery@usbr.gov.
sjnovak3 is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Topic Thread Starter Forum Replies Last Post
Navajo Operations Update- San Juan River 4/7/16 sjnovak3 Boaters Forum | General Boating Topics 18 05-14-2016 09:15 PM
Navajo Spring Peak Release Final Notice sjnovak3 Boaters Forum | General Boating Topics 0 05-11-2016 10:21 AM
Navajo Spring Peak Release- UPDATE sjnovak3 Whitewater Kayaking 9 05-15-2012 04:30 PM
Navajo Dam Operations Meeting rivermanryan Whitewater Kayaking 2 01-25-2012 10:12 AM
Final Navajo Spring Peak Release Schedule rivermanryan Whitewater Kayaking 6 05-25-2011 02:41 PM

» Classified Ads
Powered by vBadvanced CMPS v3.2.3

All times are GMT -6. The time now is 05:52 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2017, vBulletin Solutions, Inc.